Panels for broken-up roofs
Jinko Tiger Neo and Aiko panels, laid out around chimneys and valleys. We draw the layout and show it to you before you sign.
- Jinko and Aiko panels
- Layout drawn first
- Tile and Colorbond roofs
Panel layouts drawn around chimneys, gables and mature trees, with a battery placed where your extension and switchboard allow. Installed by our own SAA accredited A-Grade electricians, with rebates worked out on the quote.
Balwyn is one of the older, more settled parts of Boroondara. Between the post-war brick homes, the 1960s to 1980s brick veneers and the larger renovated and rebuilt houses, almost no two roofs are alike. You get hips, gables, dormers, chimneys and extensions that sit at a different pitch to the original house. That is why solar and battery Balwyn quotes should start with the roof, not a standard package.
Trees are the other variable. Mature street trees and big backyard gums can shade one face of a Balwyn roof for half the day, so we map the shading first and put panels where they earn their keep, then decide if a second face is worth using. Where the best light is on an east or west face, we use it, and size the battery to carry the evening when the sun has gone.
Many Balwyn homes have been added to over the decades, which means the switchboard may sit in an odd spot and the cable run to the garage is longer than you would expect. We check that at the visit, and if your home has a heritage overlay we check panel placement with that in mind before anything is drawn. It all sits alongside the other work we do in Balwyn.

Brands we stock and trust, fitted by Powerband employees and nobody subcontracted.
Jinko Tiger Neo and Aiko panels, laid out around chimneys and valleys. We draw the layout and show it to you before you sign.
Sigenergy SigenStor, GoodWe, Tesla Powerwall and Sungrow. Most Balwyn batteries go on a garage wall or a protected side wall, sized to cover the 4pm to 9pm peak and set up with backup circuits for the circuits you care about most.
A hybrid inverter if a battery is coming, or SolarEdge and Fronius where shading splits the array. We confirm your supply, single or three phase, before choosing the unit and lodge the network application ourselves.
Older boards, and boards that moved during a renovation, are common. We test, upgrade where needed and keep the battery cable run short and tidy, including routes hidden behind downpipes.
The full range is on our products page.
Tier-one panels with 25-year performance warranties, laid out for the roof faces you have.
Hybrid and string inverters, chosen so a battery can join the system now or later.
Home batteries sized to the evening peak, with backup circuits set up for outages.
Home chargers wired into the same system and set to charge from your solar first.
We have not written up a Balwyn job yet. These are the closest, each with the full specification on its page.
A double-storey three-phase home with tile, tin and Klip-Lok roof sections. Nineteen panels went flat on the roof, with the battery on the garage wall and the DC cable run hidden behind the downpipe.
All-black panels across west, east and south-east faces of a tiled roof, with the battery behind bollards in the garage. A heat pump and two replacement split systems were done on the same visit.
Twenty-eight Aiko panels on a terracotta tile roof, a three-phase Sigenergy inverter with 24.18kWh of storage, and a heat pump hot water unit fitted in the same job.
The steps are the same whatever the house, but the design step takes longer on a roof like yours.

We look at every roof face, the trees around it, the switchboard and the places a battery could go, and ask what you plan to electrify next.
A drawn panel layout, inverter and battery sizes, brands, and one after-rebate price. If a heritage overlay applies, placement is checked first.
Solar Victoria eligibility for the panels and inverter, federal discounts and the network application, all before install day.
Panels, inverter, battery and any switchboard work. Most systems are finished in one day, longer for large or complex roofs.
Phone monitoring set up, backup circuits tested with you watching, and the Certificate of Electrical Safety issued.
Each incentive has its own rules and covers a different part of the system. We check them against your household before quoting.
The Cheaper Home Batteries discount, around 30 percent off an approved battery with no income test, taken off on the quote.
For eligible owner-occupiers, on the solar panels and inverter only. There is no Solar Victoria battery rebate or loan, both closed in 2025.
Small-scale technology certificates come off the price at point of sale. If a new reverse cycle system is next, see heating and cooling in Balwyn.
A roof like a Balwyn roof punishes a rushed quote. Here is how we handle it.
The panel plan is drawn and shown to you before the fixed quote, so you know where every panel goes.
SAA accredited, New Energy Tech Approved Seller, and no subcontractors on your roof or at your switchboard.
We also fit reverse cycle, heat pump hot water and EV chargers, so the system is sized for what the house will run.
Camberwell, Surrey Hills and Box Hill installs are written up on this page with real specifications.
Live Google reviews. Look for the Sigenergy, GoodWe and Powerwall jobs.
Questions about your own roof? Call 0466 355 441 and speak to an electrician.
It depends on the roof shape more than the house size. A typical brick veneer takes somewhere between 6.6kW and 13kW once we have mapped the faces and the shade. We draw it before quoting.
Not always. We check where the shade falls through the day and keep panels off the worst-affected areas. Where shading splits the array, SolarEdge optimisers can help.
Usually. The question is the distance to the switchboard and a spot that meets clearances. We measure on the visit and include longer cable runs in the quote.
If it does, panel placement on street-facing roof faces is checked before design. We can lay out the system on the faces you can use and tell you what we find.
Often, in older homes and in renovated ones where the board was moved. We test it at the visit and put any upgrade in the same fixed price.
Usually. Depending on the age and brand of the inverter, the battery goes alongside it or we swap to a hybrid unit. We tell you which after seeing the system.
A roof visit, then a written quote with the panel layout, battery size, brands and after-rebate price. No obligation.