Clyde is one of the City of Casey growth areas, 17 km and about 20 minutes from our Somerville depot. Nearly everything here was built after 2005, which changes the job: the homes are insulated, the switchboards are modern, and since Victoria's all-electric rule for new homes most of the newest builds have no gas at all. The question in Clyde is usually solar, battery and EV charging, not gas replacement.
Because Clyde is on mains gas and inside the VEU area, the typical order of works is heating and hot water first for the rebates and the running-cost drop, then solar and a battery sized to the new electric load, then the cooktop, then the gas meter abolished. We plan the whole sequence at the first inspection so nothing has to be redone.
We have been working in Clyde and around Cranbourne East, Junction Village and Clyde North for years. Site inspections are free, the quote is fixed with every rebate already applied, and the same in-house crew does the electrical, refrigeration and plumbing. If you are weighing up where to start, our home electrification page walks through the order, or call and we will tell you straight for your house.