Narre WarrenWorking in Narre Warren
Narre Warren is one of the City of Casey growth areas, 24 km and about 30 minutes from our Somerville depot. Nearly everything here was built after 2005, which changes the job: the homes are insulated, the switchboards are modern, and since Victoria's all-electric rule for new homes most of the newest builds have no gas at all. The question in Narre Warren is usually solar, battery and EV charging, not gas replacement.
Because Narre Warren is on mains gas and inside the VEU area, the typical order of works is heating and hot water first for the rebates and the running-cost drop, then solar and a battery sized to the new electric load, then the cooktop, then the gas meter abolished. We plan the whole sequence at the first inspection so nothing has to be redone.
Everything on this page is done by Powerband employees, not subcontractors, and quoted as a fixed after-rebate price after a free site inspection. For the full picture of how we stage a house off gas, see home electrification; for Narre Warren specifics, the fastest answer is a phone call.