Hampton ParkThe Hampton Park job, house by house
Most of Hampton Park's housing is estate-built since the mid 2000s, in the City of Casey corridor about 30 minutes from Somerville. Good roofs, modern wiring and, in the newest streets, no gas connection to begin with. That makes Hampton Park a solar, battery and EV suburb first, with heat pumps and induction for the earlier estates that were plumbed for gas.
Because Hampton Park is on mains gas and inside the VEU area, the typical order of works is heating and hot water first for the rebates and the running-cost drop, then solar and a battery sized to the new electric load, then the cooktop, then the gas meter abolished. We plan the whole sequence at the first inspection so nothing has to be redone.
Everything on this page is done by Powerband employees, not subcontractors, and quoted as a fixed after-rebate price after a free site inspection. For the full picture of how we stage a house off gas, see home electrification; for Hampton Park specifics, the fastest answer is a phone call.