BitternBittern, from the switchboard up
In Bittern the houses are on acres, the supply is often three-phase and the gas, if there is any, comes in a bottle. It is about 17 minutes from our Somerville depot and a big part of our work there is large solar and battery systems with backup, because the grid on the hinterland goes down more than it should.
Most Bittern properties skip the gas conversation entirely and go straight to the question that matters: how much solar and battery does this place need to run itself. We size for the real load, including sheds and pumps, and we configure backup circuits properly because power outages are a fact of life out here.
Bittern is regular territory for our crews, and a site inspection there is usually within the week. We design every job as one system, so the solar is sized for the heat pump it will run and the switchboard is checked before the EV charger is quoted.