Electrification in Templestowe LowerRebuilds are all-electric, so are the plans next door
Infill and knockdown-rebuild work is steady in Templestowe Lower, and new homes are built all-electric. Next door, the older brick veneer homes still run ducted gas heating, a gas storage hot water unit and a gas cooktop. Home electrification Templestowe Lower is largely about bringing those older homes up to the same standard, in an order that does not waste anything.
We start with the gas heater and the hot water, because they are the biggest loads and the oldest equipment. Double-storey homes may need a Braemar Dominator if the ducts cannot be replaced, otherwise it is a new unit with new R1.5 ducts. Solar and battery come next to carry the new load, then the induction cooktop, and the last gas appliance goes, so you stop paying for a gas connection you no longer use.
Supply here is a mix of single-phase and three-phase depending on the street and the age of the connection, so we look at the board before anything else. See also our work around Templestowe Lower.