1. Switchboard
Old boards often need a breaker or RCD upgrade for a 32A circuit. We test, upgrade and label every circuit, with space for the circuits to come.
- Test and upgrade
- Labelled circuits
- Certificate of Electrical Safety
The gas heater, the hot water tank and the cooktop are where a brick veneer spends its energy money. We replace them in a sensible order, with solar and a battery on top, using our own trades.
In a typical Balwyn North brick veneer the gas runs three things: a ducted heater, a storage hot water tank and a cooktop. Together they make up most of the gas bill. Home electrification Balwyn North households want is usually to replace all three over time, and the question is the order.
Many of these homes were built with 1970s switchboards, so that is the first thing we test. A modern board with spare circuits lets the heat pump, reverse cycle and induction go on without compromise, and it sets up an EV charger and battery later. After that we usually start with whichever appliance is closest to failing.
The roof does the last job. Tile roofs here are mostly unshaded, so solar and a battery can run the new appliances in the day and through the evening. Everything is done by our own electricians, plumbers and refrigeration technicians. See the Balwyn North page for the rest of our work.
This is the order most Balwyn North households follow, but we adjust to what is failing.
Old boards often need a breaker or RCD upgrade for a 32A circuit. We test, upgrade and label every circuit, with space for the circuits to come.
A gas storage tank becomes a heat pump from Emerald, Reclaim, iStore or Haier. A 270L to 300L tank suits a family of four to six, and a gas to heat pump swap is normally done in one day.
Ducted gas becomes reverse cycle on new R1.5 ducts, typically in one to two days. Where ducts cannot be replaced, usually double-storey, a Braemar Dominator is used instead.
Induction goes on its own circuit at a fixed price. Jinko or Aiko panels and a Sigenergy, GoodWe, Tesla or Sungrow battery are sized for the new load, with an EV charger when you want one.
The full range is on our products page.
Ducted reverse cycle on new R1.5 ducts, or split systems, in place of ducted gas or a wall furnace.
A heat pump in place of the gas storage or instantaneous unit, usually changed over in one day.
The last gas appliance in most kitchens, replaced with induction on its own circuit.
Solar and storage sized for the new electric load, with an EV charger on the same system.
We have not written up a Balwyn North electrification job yet. These are real ones from around Melbourne.
Gas ducted heating, gas hot water and a gas cooktop were replaced by one team in one job, with ducted reverse cycle planned room by room on the floor plan.
In Melbourne east, a 12.35kW solar and 24.18kWh battery system went in with an iStore heat pump and two replacement split systems. One crew, one visit.
A five-bedroom all-electric home with a three-phase EV charger on the same system. On a 35 degree day it drew almost nothing from the grid.
You can do it all at once or spread it over years, because the plan is written once.
Switchboard, supply, roof and every gas appliance, with its age.
A single document with the order, and what each stage involves.
Each stage has its own price with incentives taken off.
Electricians, plumbers and refrigeration technicians from Powerband.
When none are left, you can stop paying for a gas connection you no longer use.
Only some items have incentives. Here is the split.
Solar Victoria rebate and loan apply to panels and inverters for eligible owner-occupiers. Batteries get the federal discount of around 30 percent, with no income test. See solar and battery in Balwyn North.
VEU discounts apply to both, with federal STCs on heat pump hot water. All are taken off the quote and lodged by us.
No rebate. A straight fixed price.
What we do differently.
Electrical, plumbing and refrigeration, with 5,000+ Melbourne homes started on electrification.
Nothing gets installed on a board that cannot carry it.
One project or one swap a year, same plan.
Written quotes, no add-ons after work starts.
Live Google reviews. Look for the whole-home and off-gas jobs.
Call 0466 355 441 and we will go through your appliances.
The switchboard check comes first. After that, whichever gas appliance is oldest, often the hot water tank.
If it is old, yes. A heat pump makes hot water with about a quarter of the energy of a gas storage unit.
Often. Ducts that cannot be replaced are kept with a Braemar Dominator. Otherwise new R1.5 ducts are the default.
No. They are a fixed price on their own circuit.
Yes. The switchboard and circuits are set up so solar and a battery can follow.
Once the last gas appliance is replaced, you can stop paying for a gas connection you no longer use.
A whole-house inspection, then one written plan with a fixed price for each stage. No obligation.